(1) The technical regulator may prepare a draft technical code.
(2) The technical regulator must give a copy of the draft technical code to—
(a) the ICRC; and
(b) each regulated utility providing services that are likely to be regulated under the draft code.
(3) A person who is given a copy of the draft technical code under subsection (2) may make a submission to the technical regulator about the draft technical code within a stated period of not less than 20 days.
(4) The technical regulator—
(a) must consider a submission made under this section; and
(b) may make a recommendation to the Minister about approval of the draft technical code.